Certification Of Completed Projects



Certification Of Completed Projects

Taiwan Cement Engineering Corp. - a member of Taiwan Cement Group
Project: Thach Thanh Sugar Mill Project
As you are well aware, the sugar plant was running smoothly and we wish to express our sincere appreciation again for your valuable support and assistance to us in the execution of VTSC plant construction. We are confident that we can corporate in a future as we have in this project
8/8/1997 -  Daniel C.H.Chien -Project Manager

Vietnam Float Glass Co., Ltd.
Project: Vietnam Float Glass Factory
Construction Machinery Corporation is a Contractor of VFG in manufacturing, supplying and installation of following mechanical products: Equipment, steel structure of beam for Furnace, Tank; Bath and Furnace cooling duct system, dust collector; Batch, Cullet and silica sand conveyor systems with total weight: 12,000 tons.
All of mentioned above products has achieved high quality and fully meet the VFG's delivery schedule.
Hiroyuki Nakamura - Technical Director

The Nghe an Tate & Lyle Sugar Co., Ltd
Project: Nghe an Tate & Lyle Sugar factory
It is hereby to certify that: The Construction Machinery Corporation - Hoàng Dũng has executed the following works: Designs, fabrication and installation of 05 bagasse conveyors with band length of 2,135m; Design, fabrication, erection of molasses tank with capacity of 8,000m3 and other tanks; Installation of cane sugar mill equipment; fabrication, erection of steel structures of various types with total weight: 800 tons.
The works mentioned above products have been fabricated and installed with very good quality and satisfactory delivery schedule.
Hanoi, 5/10/98 - Bruce Mc Kay - General Director

Campenone Saigon Builders Ltd.,
Project: Ha Tay Brewery Ltd.

It is hereby to certify that: The Construction Machinery Corporatioon - Hoàng Dũng has executed the Supply, Fabrication, Erection of Steel structures and roofing, cladding works for Ha Tay Brewery Project with total weight of 1,200 tons.
The works have been completed with very good quality and satisfactory delivery schedule.
Ha Tay, 30/9/1998 - Andrew Farrimond - Project Director

ABB Industryl Co., Ltd
Project: Nghe An Sugar Factory
It is hereby to certify that: The Construction Machinery Corporatioon - Hoàng Dũng has executed the fabrication of Steel structures and completely erection of Nghe An Sugar Project 160TPH Bagasse/Oil Fired Boiler works for Nghe An Sugar Company with total weight of 1,500 tons.
The works have been completed with very good quality and satisfactory delivery schedule.
Ha noi, 30/9/1998 - ABB Industry Co. Ltd

Mitsui Babcock Energy  Limited CRAWLEY AND RENFREW
Project: Pha Lai 2 Thermal Power Plant
It is hereby to certify that: The Construction Machinery Corporatioon - Hoàng Dũng has executed the following works: fabrication of flue gas and duct, gratings, handrails, tread for Phalai 2 thermal Power Plant with total weight of 1,500 tons.
The works have been completed with very good quality and satisfactory delivery schedule.
Ha noi, 7/3/2000 - Mitsui Babcock Energy Limited

Densit D - A member of the FLS Group
Project: Pha Lai 2 Thermal Power Plant
It is hereby to certify that: The Construction Machinery Corporatioon - Hoàng Dũng has executed the fabrication of Densit lined PF-Pipes for Phalai 2 thermal Power Plant, Viet nam and HoPing Power Plant, Taiwan, Hoàng Dũng and its employees have been very quality conscious, and the works have been completed within the fabrication schedule to our full satisfaction.
Aalborg, 14/6/2000 - Hans M. Christensen - Project Manager

Mitsubishi Heavy Industries, Ltd.
Project: Phu My 1 Combined Cycle Power Plant Project
This is to certify that: The Construction Machinery Corporation - Hoàng Dũng successfully performed the fabrication of main parts of Heat Recovery Steam Generator such as Hot beam, Gas Duct, Casing and others such as Deminerralized Water Storage Tanks, Reserve Feed Water Tank, CCCW Head Tank, S/T Flash Tank, HRSG Blown Down Tank, portable Water Tank and 10,000 m3 Distillate Oil Storage Tanks for Phy My Combined Cycle Power Plant Project. 
Thanks to Hoàng Dũng's good management, friendly cooperation, experienced engineers and skillful workers, all the fabrication works were made to the required quality and extremely tight schedule etc.
01/01/2000 - Chusei - Supervisor Coordinator